All projectsPower · 2023
CEMS retrofit across 4 × 250 MW units
Public sector thermal power utility
Summary
Retrofitted four stack CEMS skids with heated extractive systems, dilution probes and CPCB telemetry. Replaced legacy analyzers with NDIR + Chemiluminescence stack.
Outcomes
- 4 stacks, zero downtime cutover
- 0.5% drift over 6 months
- AMC for 5 years